spud 12 Mar 2014 · 4½″ tubing × 9⅝″ casing · toe 4,200 m MDMethod profile: demo-offshore v0 (placeholder, unsigned)
Illustrative values — placeholder method bands; no signed method profile (Gate B)
Wellbore register 20″ 0–80 m · 13⅜″ shoe 800 m MD · 9⅝″ shoe 1,900 m MD · cement top 1,180 m MD · 5½″ screens 1,900–4,200 m MD · packer 1,500 m MD · DHSV 210 m MD · KOP 900 m MD · toe 4,200 m MD · A = tubing × 9⅝″ csg · B = 9⅝″ × 13⅜″ csg (13⅜″ shoe breakdown governs) · C cemented, not monitored · placeholder bands: normal < 60% · elevated 60–100% · exceedance > 100% of MAWOP
YELLOWB-annulus elevated at 65% of MAWOP (22.6 vs 34.5 barg) · sustained rise +0.48 barg/month over 6 readings · SCP diagnostic A-114 due 30 Sep 2026
Barrier schematic
generated from register
flagged gap / assumptionnot to scale · MD compressed at the break1 data assumption