Integrity tests

schedules and acceptance criteria from the method profile · today 22 Sep 2026 Scope: All assets · 52 wells
Illustrative values — placeholder method bands; no signed method profile (Gate B)

Test schedule

showing 9 of 118 schedules — all overdue plus the 5 earliest due
Overdue 4 Due ≤ 30 days 8 Later 106 All 118
WellAsset TestAnnulus Next dueState
A-07Alpha PlatformAnnulus pressure testA10 Sep 26overdue 12 days
A-11Alpha PlatformAnnulus pressure testA19 Sep 26overdue 3 days
A-12Alpha PlatformValve integrity test20 Sep 26overdue 2 days
L-14Bravo fieldAnnulus pressure testB15 Sep 26overdue 7 days
A-05Alpha PlatformAnnulus pressure testB04 Oct 26due in 12 days
B-12Bravo fieldValve integrity test06 Oct 26due in 14 days
A-01Alpha PlatformAnnulus pressure testA14 Oct 26due in 22 days
L-02Bravo fieldAnnulus pressure testB18 Oct 26due in 26 days
A-03Alpha PlatformAnnulus pressure testA28 Oct 26scheduled

Schedules by asset

AssetSchedulesOverdueDue ≤ 30dLater
Alpha Platform273519
Bravo field911387
All assets11848106
Frequencies, grace periods and overdue escalation come from the method profile (placeholder — not signed): grace 7 days, escalate at 14 days.

Recording a test

4 steps
1 · Record the test
date, annulus, test pressure, duration, who witnessed it
2 · Acceptance criteria applied
from the method profile — the engine checks pass/fail, no manual verdict
3 · Attach evidence
chart, field sheet, photo — stored with the record
4 · Sign-off
integrity engineer approves · closes the schedule item

Evidence pack

internal report
ExportPDF + ZIP · internal report, not a regulatory submission Includestest record · acceptance criteria applied · attachments · approval trail Scopeone test (this view) or a period pack from the review screen